ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ PAGE Chapter 3: Tape maintenance and diagnostics Tapes are used on a regular basis to make backups of the master and slave databases. Because tapes and tape drives are used so frequently, they must be maintained to ensure that tape data is not corrupted. Maintenance routines are divided into two broad categories, tape handling procedures and tape drive maintenance. Tape drive diagnostics are also divided into two major groups, a) manual diagnostics and b) automated diagnostics. Tape handling procedures Correct procedures should be used when handling magnetic tape. Procedures are given for the following tasks: tape threading and loading, tape winding, tape unloading, tape storage, reel handling, write protection and reflective tape maker installation. Tape write protection A tape can be loaded with or without a small removable plastic ring called the write-enabled ring. With the write-enabled ring, read and write tape operations are permitted. Without the write-enabled ring, only read operations are permitted. Note: The write-enabled ring should only be installed when its use is absolutely required. The ring should be removed before storing the tape. If both read and write tape operations are required install the write-enabled ring using the following procedure: 1 Line up the protruding key on the plastic write-enabled ring with the notch on the hub of the tape reel. 2 Gently push the write-enabled ring into the write-enabled ring groove on the tape reel, until the ring is firmly seated. ==> When the reel is mounted in the tape drive unit, a sensing device in the tape drive detects the presence of the ring and allows information to be written to the tape. Tape threading and loading Tape must be threaded through the tape drive unit before it can be loaded. Tape loading can be done in two ways, manually or by enabling the power-on auto load option. To thread and load the tape manually complete each step given below sequentially beginning with step 1. Note: If the power-on auto load option is enabled, complete the following steps in the order specified here: steps 3, 4, 5, 6, 7, 1, 2 and 9. This order ensures that the tape is threaded before automatic loading begins. 1 Open the dust cover door of the tape drive unit and power-up the unit by turning it on. ==> The logic off indicator flashes on for a moment, and then the logic on and file protect indicators remain lit.,The high density indicator may also be lit . 2 The automatic system test is run to check the health of the tape drive unit. ==> If a fault is detected during the test a number is displayed on the two digit display panel. Follow the corrective procedures given below: PAGE w Press the RESET and LOGIC OFF controls. ==> The display is cleared. w Press the LOGIC ON control to repeat the automatic power-up test. ==> If the same or a different fault is detected, a number is displayed on the two digit display panel. w Look up the fault code in Table 5 to determine the corrective action required. Clear the fault and repeat step 2. 3 Position the hands on the reel in the 11:00 and 5:00 positions so that they are aligned with recesses in the unit. 4 Press the inner button on the face of the supply reel hub and mount the reel against the rear flange. 5 Press the periphery of the hub face to the latch reel to secure the supply reel. ==> The tape is now mounted... 6 Thread the magnetic tape over the tape path (as illustrated in Figure 2) by first taking the tape from the top reel and wrapping it up and over the top first air bearing. Next, feed the tape straight down past the tape cleaner blades, the EOT/BOT sensors and the head, and then around the lower air bearing from underneath. 7 Wrap the tape on the (lower) take-up reel, and then turn the reel clock-wise several times to make sure the tape does not fall off. Figure 2 Tape path 8 Close the dust cover door and press the LOAD/REWIND control to initiate tape loading. ==> The compressor starts and the tape begins moving forward after a one second delay. The tape stops when the beginning of the tape reflective marker is detected. The bot indicator is lit when the marker is found. Note: If the tape reflective marker is not detected within the first 40 ft, the tape is automatically stopped, and its direction reversed. The tape is rewound until the reflective marker is detected. When it is the BOT indicator is lit. By successively pressing and releasing the load/rewind control button, the tape density can be selected. Every time the button is pressed, after the tape is initially loaded, the tape density is toggled between high and low density. 9 Press the ON-LINE control to place the unit on-line. ==> When the tape has finished loading, the on-line indicator is lit. Tape winding When tape is wound at high speeds, the tape layers may not stack uniformly because of air getting trapped between the layers. This condition does not hamper tape operation but requires that the tape operator use special care when handling the reels. Reel handling When handling any tape reel, observe the following precautions: (a) Tape reels should be handled at the hub whenever possible! (b) When removing the reel from the transport hub do not squeeze the reel flanges. PAGE (c) Prevent the tape from ever touching the ground. Be particularly careful when removing the tape reel from the canister. Tape storage Tapes should be stored in an upright position (not flat) in an area not exposed to magnetic fields. When stored in conditions that are below or above room temperature, allow the tape and reel to stabilize at room temperature before use. Tape unloading To unload a tape, the following procedures are used: 1 Press the RESET control. ==> The transport is taken off-line. 2 Press the UNLOAD control. ==> The tape is rewound back onto the supply reel. 3 Open the dust cover and position the hands on the reel at 11:00 and 5:00 so that they are aligned with the recess of the unit. 4 Press the center button face of the supply reel. ==> The hub is unlatched and the supply reel removed. 5 Remove the supply reel. 6 Close the dust cover door. Reflective tape marker installation Reflective tape markers are pieces of highly reflective (usually silver colored) adhesive tape used to mark the beginning and ending of a tape. Each tape comes with reflective markers, but if the tape is damaged and new reflective markers need to be installed, they must be positioned as specified below: (a) If the beginning of tape (BOT) marker needs to be replaced, measure 16 ft (+ 2 ft) from the physical beginning of the tape. At this spot position the marker on the shiny black side .03 of an inch from the left edge of the tape. (b) If the end of tape (EOT) marker needs to be replaced, measure 25 ft from the physical ending of the tape. At this spot position the marker on the shiny black side .03 of an inch from the right edge of the tape. Tape drive maintenance The tape drive unit is maintained through a program of regular cleaning. Instructions for cleaning the following areas are given: magnetic head, EOT/BOT sensor, reel hub pads, tape cleaner, air bearing and dust cover. Note: Regular cleaning takes only a few minutes and should be done after every eight hours of use, except for the magnetic head which should be cleaned daily before the daily backup is made. The following cleaning materials are recommended: a tape deck cleaning solvent, foam swabs, and lint-free cloth. WARNING Use solvents in a well ventilated area and follow all manufacture precautions listed on the package. PAGE Magnetic head Moisten a lint-free cloth with solvent. With the cloth, wipe the head recording surface in the same direction as the tape moves across the head. Tape cleaner and EOT/BOT sensors Moisten a foam swab with solvent. Use the swab to remove dirt and oxide from the tape cleaner blades and the EOT/BOT sensors. Air bearings Moisten a lint-free cloth with solvent. With the cloth clean all parts of the air bearing including the foil area, the guide springs, and tape guides. Use a mirror to make sure all dirt or oxide is removed. Supply reel hub pads Moisten a lint-free cloth with solvent. Use the cloth to clean the three hub pads on the supply reel hub. Dust covers Dust the dust covers with a lint-free cloth as required. Dust should not be allowed to build up on the cover. Operator diagnostics Operator diagnostics can be broken into two parts, a) manual inspection and control panel inspection, and b) status diagnostics/test routines. The operator may be able to diagnose a number of problems simply by inspecting the tape and the tape drive. The control panel too, has a number of indicators which if read correctly can help the operator diagnose simple problems. The fault number display is particularly informative. The diagnostics/tests can be used to identify less obvious problems. There are three diagnostics/tests available. Note: Regular maintenance should include running diagnostic tests once a week in addition to testing when faults occur. Manual inspection Many faults are a result of simple mechanical or media-related conditions. If data errors are reported, inspect the tape path for dirt accumulation or damage. Clean or replace the required parts. If the problem persists replace the tape and reel. (If the supply reel and tape is recycled as part of normal operating procedures, the tape may be wrinkled, stretched and otherwise worn, or the reel may be damaged.) Control panel When the tape drive unit takes itself off-line and lights the reset indicator, a fault number is displayed on a two digit display. This fault number is keyed to a description and fault clearing procedure given in Table 5. Although the two digit fault indicator is perhaps the most useful display on the control panel other indicators and controls can assist. The control panel is illustrated in Figure 3. The indicators and controls illustrated are described in the pages that follow. Figure 3 Tape drive control panel PAGE Table 4 Tape drive controls ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿ ³Name Function ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Logic Off Control: removes dc power to the transport ³ ³ Indicator: lights when standby power condition exist ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Logic On Control: powers the transport ³ ³ Indicator: lights when power is on ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³File Protect Indicator: lights when the write-enable ring has not been ³ ³ installed; means tape is in read-only mode ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Load/Rewind Control: loads tape if tape is threaded; rewinds tape if ³ ³ tape is loaded. Automatically sets 25 ips start/stop mode. ³ ³ When configured for local density select mode and tape is ³ ³ BOT, pressing this control toggles density between high ³ ³ density and low density. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³BOT Indicator: lights when tape is positioned at the BOT ³ ³ reflective marker ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Unload Control: rewinds tape unto supply reel ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³On-line Control: makes transport subject to system control ³ ³ Indicator: lights when tape drive is on-line ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Reset Control: takes unit off-line, stops tape and clears errors ³ ³ (to clear some control faults unit must be turned off and ³ ³ then on again) ³ ³ Indicator: lights when unit error condition exists or at ³ ³ completion of diagnostic test ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³High Density Indicator: lights when tape drive runs in the high density ³ ³ mode ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Two Digit Display Indicator: lights a two digit number under two conditions, ³ ³ a) when lit in conjunction with the reset indicator, the ³ ³ number shows diagnostic fault code or online operational ³ ³ failure, b) when lit in off-line diagnostic/ test mode, the ³ ³ number shows test numbers and results. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Diagnostics Indicator: lights when in diagnostic/test mode ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Test Control: puts unit in test mode if it is not on-line ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Step Control: steps through diagnostics/tests sequentially when ³ ³ in diagnostic/test mode ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Execute Control: initiates test /diagnostic routine displayed on two ³ ³ digit display when unit is in diagnostic/test mode ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³CE Control: initiates special customer engineering diagnostics ³ ³ when unit is in diagnostic/test mode ³ ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÙ Table 5 Fault codes ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿ ³Fault ³ ³Code ³ ³Number Corrective Action ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³00 No fault found. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³01 - 09 Clean magnetic head and tape path using cleaning (maintenance) procedures. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³10 Close the front door securely. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³11 Thread tape. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³12 Indicates one of several loading problems. Check the following: latch the supply reel ³ ³ hub, make sure the reflective tape marker (BOT) is positioned correctly, adjust tape ³ ³ tension if required. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³13 Thread tape correctly. Refer to Figure 2. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³14 Replace reflective tape marker (BOT) if missing. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³15 Reset control pressed. Reinitiate test. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³16 Install write-enabled ring if missing. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³17 Replace reflective tape marker (EOT) if missing. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³ ³ ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÙ PAGE ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿ ³18 Test could not start because tape was loaded. Thread tape but do not press the load ³ ³ control. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³20 - 29 Mount a tape of known good quality. ³ ³ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄij ³Others Report fault to maintenance personnel. ³ ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÙ Diagnostics/tests There is only one diagnostic test the operator can select from the control panel. Optional tests may be run only after the first is completed. The first test, called Status - Test 01, takes approximately 13 minutes to run when a 10.5 in. tape reel is used. If a fault is detected during the test, the test is stopped, and the fault code displayed in the two digit display. All fault codes must be recorded and passed to maintenance personnel. Status - test 01 This is designed to exercise basic tape and tape drive unit functionality. The test begins by exercising the two digit display. The operator must ensure that number are displayed sequentially during this part of the test. The test is executed using the following procedures: caution The tape drive unit must always be left powered on. It is required to terminate the SCSI disk/tape bus. 1 Press the LOGIC ON control. One of two actions may result: w A fault occurs and a fault code is displayed. ==> Discontinue testing and report the fault code to maintenance personnel. w The logic on indicator is lit. ==> The test may continue. 2 Thread tape through tape path and onto take-up reel. Do not load the tape! 3 Close the front door, and press the TEST control. ==> The diagnostics indicator is lit and a 01 fault code is displayed. 4 Press the EXECUTE control. ==> The logic off, BOT and high density indicators are lit, and the sequential fault code display test begins. 5 Watch the sequential number display carefully and note any irregularities. (This should take three minutes). Verify that the indicators are lit. 6 The remainder of test is executed automatically and takes 10 minutes to complete. The test may be successful or unsuccessful. w If successful ==> The unit rewinds and unloads the tape unto the supply reel, displays the 0 fault code and lights the reset indicator. w If unsuccessful ==> Diagnostic testing stops, the reset indicator is lit and a fault code is displayed. Look up the corrective action specific to the fault code, perform the required actions, then restart test 01. PAGE ==> Even if the second try is successful, report the fault code to maintenance personnel. Status - test 02 In order to run test 02, test 01 must precondition the unit first. For test 2 the tape is threaded but not loaded. Use the following procedures to run diagnostic test 02: 1 Press the RESET control. ==> The fault code displayed from test 01 is reset to 00. 2 Thread tape through tape path and onto take-up reel if it is not already. Do not load the tape! 3 Press the TEST control. ==> The diagnostics indicator is lit and 01 (test code #) is displayed in the two digit display area. 4 Press the STEP control once. ==> The test code number has stepped from 01 to 02 5 Press the EXECUTE control. ==> The test is executed and finished within a minute. When complete the reset indicator is lit and a fault code is reported in the two digit display area. 6 Record the fault code to maintenance personnel (other than 00). Status - test 03 In order to run test 03, test 01 must precondition the unit first. Test 03 can be run immediately following test 01 or test 02. Test 03 is run without a tape. Use the following procedures to run diagnostic test 03: 1 Press the RESET control. ==> The fault code displayed from test 01 or test 02 is reset to 00. 2 Press the TEST control. ==> The diagnostics indicator is lit and 01 (test code #) is displayed in the two digit display area. 3 Press the STEP control twice. ==> The test code number steps from 01 to 02 to 03. 4 Press the EXECUTE control. ==> The test is executed and finished within a minute. When complete the reset indicator is lit and a fault code is reported in the two digit display area. 5 Record the fault code, if any, to maintenance personnel.